C H I L M A R K B O A R D O F H E A L T H
Agenda
September 15, 2010
Chilmark Town Hall,
5pm
Minutes of September 1, 2010
Wells and Septic Systems
Davis, 290 South Road, (24-195) discussion with Derrill Bazzy, South Mountain Company
Shae, 11 Hammet Lane (8-43) Field Inspection and Service Report on FAST Wastewater Treatment System, Wastewater Treatment Services, Inc.
Goldberg, 19 Peaked Hill Road (19-5) disposal system construction permit (George Sourati)
Eaton, 29 Tilton Farm Road (18-14.4) disposal system construction permit (George Sourati)
Lee, 1 Clampoint Road (33-120) septic system repair permit (Reid Silva)
MV Savings Bank, 82 South Road, (11-83) Title 5 Inspection Report – passes
Ryan (c/o Conroy Real Estate), 188 State Road (33-76.2) Title 5 Inspection Report – passes
Walsh 320 South Road (25-11) Ruling: Motion denied
Levy/Church, 8 Greenhouse Lane, Map 33-30, 177) manhole cover and riser installed, per letter of 9/7/2010 from Doug Cooper
Food Establishments, Farms
Grey Barn milk processing wastewater facility: BOH role?
Chilmark School Lunch Program
Miscellaneous
Regulation Revision: Section 3: Sewage Treatment and Disposal Systems draft
Public Hearing for addition of Milk Pasteurization License fee to Fee Schedule
Delinquent taxpayer list
Invoices
· Mileage reimbursement for travel to Holliston, MA Water Treatment Operator Training $79.40
· Bailey’s test strips – need $9 additional to the $14.50 already paid.
· Treatment 1 Operator certification application $70
· Mileage to Framingham, MA for Water Treatment Operator exam $93.30
· VNA, August 2010 $748
|